Projects Completed in 2006
-
Tramline / Tramtrack
work of Calcutta under supervision of Tantia Construction
Ltd. & GPT Infrastructure Ltd.
Replacement of old tram tracks with new
one,high standard concreting,ancillary works, overall
development of roads.
-
Road Railing /
Pedestrial Guard Railing at various places adjoining Calcutta
This road railing is fitted around Victoria Memorial,
Kolkata, India.
-
Polyurathane Pulley for
mines
|
| |
 |
 |
 |
| These polypulleys
are being used in copper mines in Zambia. |
| |
|
| |
 |
 |
| These hatches are being used
by Nabrico,USA |
|
| |
- Trestle arrange for IRCON Railway Bridge at River Ganga
|
| |
|
| |
- Linc Pin ( 450 mm dia x 2500mm long ), 55C8 for Cantilever erection for IRCON Railway Bridge at River Ganga, Patna
|
| |
|
| |
- Buffer Slab
Bearing Slab ( 225mm x 1280mm x 1410mm ), 55C8 for Cantilever erection for IRCON Railway Bridge at River Ganga, Patna
|
| |
|
| |
- Bearing Slab : for Cantilever erection for IRCON Railway Bridge at River Ganga, Patna
|